Skip to content
GeoEQ · Geotechnical software research lab · University of Utah

Documentation / Getting started

Project settings in GeoEQ SPT Logs: units, N-graph and refusal

Applies to 1.1 and later · current 1.2 2 min read

Short answer

Double-click a project (or right-click, Project settings) to set units, test interval, N-value graph scale, how values past the scale are drawn, how refusal reads in the N column, coordinate display and water marker. Units change labels only; values are never converted.

1.5 m / 1.5 m
default test interval / first depth
0 to 70
default fixed N-value graph scale
Labels only
units never convert values

Where are Project settings?

Double-click a project in the explorer, or right-click it and choose Project settings. The settings belong to that project only, and the file can hold other projects with different choices. The 1.1 release added the SPT and N-value options below. Every default reproduces version 1.0, so a project you do not edit draws exactly as before.

What do the general settings do?

  • Project name, client, location: pulled automatically into every borehole header in the project.
  • Coordinate display: X / Y, Lat / Long, or Both. Each borehole stores both pairs.
  • Water table marker: classic symbol with level line (default), classic symbol only, filled triangle, triangle with GWT label, or water droplet.
  • About: free notes stored in the file.

How do I choose metric or imperial units?

Under Units, pick Metric (m, kPa, mm, the default) or Imperial (ft, tsf, in). The labels on the input tables, the Header tab and the sheet change together. Depth, RL, thickness, qu, boring diameter and the end-of-hole note are relabelled.

Values are never converted. If you switch a project that already holds numbers, they stay as typed.

How do I set the test interval and depth ruler?

Test interval / first depth drives Generate depths on the SPT & samples tab. The default is 1.5 m starting at 1.5 m. Set the first depth to 0 to start at ground level. Depth ruler interval is Auto, which follows the test interval, or a fixed spacing.

How do I scale the N-value graph?

SettingChoices
N-value graph scaleFixed (0 to 70 by default, or your own full scale from 10 to 300) or Auto-fit to the data
Values past the scaleClamp at 50 (default, as version 1.0), Mark as refusal at the edge, or Extend the scale to fit
Refusal shown asAs recorded, such as 50/75 (default); >50; Ref; or R

A refusal typed as 50/75 is always marked on the graph, whichever option you choose for values past the scale.

What should I know about the R notation?

R is also the symbol for Rock in the strata column, so a sheet that carries rock can read it two ways. That is why it is offered but is not the default. See rock coring.

For how N is defined and why field N is not the same as corrected N60, see the glossary entry on N60.

Step-by-step tutorials

Frequently asked questions

Does switching to imperial units convert my numbers?

No. Units change the labels on the input tables and the sheet, from m, kPa and mm to ft, tsf and in. Values are never converted, so enter them in the unit the project uses.

Can one office run metric and imperial projects together?

Yes. Units are set per project, so a metric job and an imperial job can sit side by side.

How is refusal shown in the N column?

As recorded, such as 50/75, by default. You can choose greater than 50, Ref, or R instead. Note that R is also the Rock stratum symbol, so it can read two ways on a sheet containing rock.

What happens to an N-value above the graph scale?

By default it is clamped at 50 on the graph, as in version 1.0. You can instead mark it as refusal at the edge or extend the scale. The printed value always keeps the real number.